Engineering & Management
UET Uran has access to a dynamic group of engineers in certain fields and the ability to carry out various engineering works meet with global codes and criterias.
As well as UET Uran is able to perform these activities with his own resources, also would outsource by using reputable companies.
Construction engineering for steel, and composite structures
Industrial detail enginering for power plants, refineries, oil & gas plants
Electrical & Instrumentation engineering for plants and electrical networks
Construction engineering for steel, and composite structures
Industrial detail enginering for power plants, refineries, oil & gas plants
Electrical & Instrumentation engineering for plants and electrical networks
Mechanical engineering which include all aspects of mechanical works
Geothermal drilling BOP Equipment Design
Project Management: planning, procurement & logistics, cost control, construction management
Geothermal drilling BOP Equipment Design
Project Management: planning, procurement & logistics, cost control, construction management